After the water is cooled, the condenser material thickens. After the operation, use the cleaning solution to clean the inner wall for 5-10 minutes. If necessary, replace the cleaning solution several times, and increase the cleaning time. The newly installed drainage pipe must remove the inner wall of the drainage pipe. To prevent the slag and hard particles from entering the pump cavity and damaging the stator, pump casing, main shaft bearing, machine seal, etc. Regularly maintain all connections and tighten the screws, if any, tighten them immediately. Check the gearbox oil mirror frequently .If the oil surface layer is visible, it must be oiled. The dripping oil should be more than half of the oil surface mirror.


